From Malay Mail
Tawau water plant resumes operations after two-week disruption, but residents face longer wait for stable supply
TAWAU, Oct 28 — The Utara Water Treatment Plant (LRA) here began operations in stages on Monday following an impro...
From Malay Mail
TAWAU, Oct 28 — The Utara Water Treatment Plant (LRA) here began operations in stages on Monday following an impro...